Representative project
2020.
프로젝트 명
주요 수행 내용
Order intake for Continuous Casting MOLD Optimized...
Optimized EMRS function is added to existing MM-EMS in POSCO PH 2-1 Continuous Casting Machine to reinforce stable operation
2020.
프로젝트 명
주요 수행 내용
Order intake for Blast furnace Bosh Repair at HSC ...
Repari project of Bosh & Tuyere area for Blast Furnace campaign extension. Engineering, Technical supprot and site supervision service collectively supply.
2020.
프로젝트 명
주요 수행 내용
Order intake for H-beam Mold copper plates at HSC ...
Development and supply of mold copper plates from XIXIA in China as a replacement for European products
2019.
프로젝트 명
주요 수행 내용
Order intake for Technology development of Clean G...
A Project to develop a system that prevents harmful gas and fine dust discharged to the outside of Blas Furnace by adding a separate clean vent gas line without opening the bleeder valve that is normally opened during unexpected blowdown and regular maintence stop. Signed an agreement to share Intellectual Property Rights with HSC and completed application for European and international patents
2019.
프로젝트 명
주요 수행 내용
Order intake for Blast Furnace Hearth Acoustic mea...
Provide HEE(Hearth Echo Excellence) measurement service that is available to recognize the residual thickness, crack, detachment and gap of the remaining refractory in the Blast Furnace.
2019.
프로젝트 명
주요 수행 내용
Order intake for Blast Furnace feasibility study o...
Feasibility study for BF volume expansion and related auxiliary facilities for HSC #1BF
2019.
프로젝트 명
주요 수행 내용
Order intake for Edge Heater Spare Car of HSC #1Ho...
Design and supply of Spare car for Edge Heater system at HSC DJ #1HRM New maintenance and test platform that enables maintenance frendly and function testing of the Edge heater system in operation
2019.
프로젝트 명
주요 수행 내용
Order intake for Strand In-roll Electro Magnetic S...
Supply Spare In-roll for Strnad EMS(In-roll type)
2019.
프로젝트 명
주요 수행 내용
Order Intake for Descaling System reinforcement of...
Supply Design, manufacturing, engineering, and supervisor service of Descaling system for POSCO GY #4HRM reinforcement Project (Install additional RM)
2018.
프로젝트 명
주요 수행 내용
Order intake for Advanced Mold Level Automatic Con...
Project to improve operational stability through upgrade operating system and control programs